Home  > News

Vize Ring Road Opening

Vize Ring Road Opens... Meeting the growing needs of Kırklareli With the project completed by ATİS and İSPA, partners of Metgün İnşaat Group companies, travel time between Saray and Kırklareli will be reduced from 78 minutes to 45 minutes...

Share:

The Vize Ring Road is opening... It will meet the growing needs of Kırklareli as it expands.

Metgün İnşaat group companies ATİS and İSPA have completed a joint project that will reduce travel time between Saray and Kırklareli from 78 minutes to 45 minutes...

Metgün Construction - Atis, Kırklareli Vize Ring Road
Metgün Construction - Atis, Kırklareli Vize Ring Road

The 6.3 km Vize Ring Road, located between the 71.1 km Saray-Kırklareli Road connecting Kırklareli to Tekirdağ via organized industrial zones and the European Free Zone, is opening as part of the Saray-Kırklareli road project.

In order to improve the transportation standard between the provinces of Kırklareli and Tekirdağ, the project completed in 2019 with Atis-İspa Joint Venture will alleviate traffic by diverting heavy vehicle traffic originating from the organized industrial zones between Saray-Vize-Pınarhisar and Kırklareli away from city centers.

Instead of the existing surface-coated road passing through district and village centers, the project, which passes through residential areas as a divided road, has increased life and property safety along the route.

TRAVEL TIME BETWEEN SARAY AND KIRKLARELI WILL BE REDUCED TO 45 MINUTES...

Metgün Construction - Atis, Kırklareli Vize Ring Road
Metgün Construction - Atis, Kırklareli Vize Ring Road

The 6.3 km section of the Vize Ring Road, part of the 71.1 km Saray–Kırklareli Highway, has been designed to the standard of a divided road with asphalt hot mix pavement and completed at the binder level.

With the opening of the Vize Ring Road to traffic, traffic in the Vize district center caused by industry and tourism in the region will be diverted outside the city, ensuring uninterrupted travel for vehicles traveling on the Saray-Kırklareli State Road route, while the travel time on the Saray-Kırklareli road will be reduced from 78 minutes to 45 minutes.

Other News
Met-Gün İnşaat'tan Adana 15 Temmuz Şehitler Köprüsü'ne Dev Bayrak
Details »
Vedat Milor Takes Hard Rock Hotel Madrid to His Corner
Details »
Metgün Construction waste incineration and energy production plant
Details »
100th anniversary celebration under the giant Turkish flag on the Adana 15 July Martyrs Bridge
Details »
Metgün Construction Installs Giant Flag on Adana 15 July Martyrs Bridge
Details »
Adana July 15 Martyrs Bridge Opened
Details »
Turkey's First, Europe's Largest Waste Incineration and Energy Production Facility Begins Operations in Istanbul
Details »